8mm Laminate Wood Flooring
Laminate floors have a relatively short life-span as compared to hardwood flooring. It is estimated that on average, a laminate floor will need to be replaced after no more than 20 years. Twenty years is the time it usually takes for a family to wear down the floor finish. Since laminate floors cannot be sanded or refinished, accumulated wear-and-tear, surface scratches and damages eventually destroy the floor.
8mm Laminate Wood Flooring
Laminate floors have a relatively short life-span as compared to hardwood flooring. It is estimated that on average, a laminate floor will need to be replaced after no more than 20 years. Twenty years is the time it usually takes for a family to wear down the floor finish. Since laminate floors cannot be sanded or refinished, accumulated wear-and-tear, surface scratches and damages eventually destroy the floor.
Laminate flooring specification | |
Color | We have several hundreds of color for your choice. |
Thickness | 7 mm, 8.3 mm, 10.3 mm, 12.3 mm |
Size | 1215x195 mm, 1215x126 mm, 1386x197mm,1800x197mm,2200x239mm etc. |
Wear Resistance | AC1,AC2, AC3,AC4, AC5 standard EN13329 |
Special treatment | Painted V-groove, Press U-groove, Waxing, Logo painted on back, soundproof EVA |
Surface treatment | More than 20 kinds of surface, such as embossed, crystal, EIR, handscraped, matt, mirror, Diamond etc. |
HDF | 770 kg /m³,820 kg /m³, 850 kg /m³ and 880 kgs /m³ |
Click system | Unilin click,Arc click,Single click |
Installation Method | Floating |
Formaldehyde Emission | E1<=1.5mg/L, or E0<=0.5mg/L |

Price Advantage
HDF production line, over 600,000sqm/monthly production capacity.laminate flooring price is more competitive than others.

Delivery Advantage
The delivery date is short, 4 weeks production time, give more support for your whole sale & projects.

Scale of Production Advantages
10 sets hot pressing machine,4 sets of profiling line, over 300,000sqm/monthly.

Excellent Quality
30+independent QC among the production line, guarantee the time as well as quality.
Require Now